Renewable Energy — Sarv Niroo Tous

EN | FA

Feature-img

Renewable Energy

Renewable Energy:
SNT designed and completed an On-grid 20KW roof type for its building and got approval as qualified companies from electrical authorities to act as EPC contractor for other investors.
SNT has negotiated and reached to the agreement with other companies from China, Oman, and other countries to develop solar and CHP projects in Iran.
Independent of network systems including solar panel, charge controller, battery and inverter that design, supply, equip and operate these systems completely done by the SNT.
SNT has prepared some offers for WTE (Waste To Energy) and WHR (Waste Heat Recovery) in cooperation with some companies from Europe and China.
 
 
SARVNIROO ACTIVITIES IN PHOTOVOLTAIC PROJECTS
The first 20 kW three-phase grid-connected project in the city of Mashhad
Initial negotiations on the multi-megawatt farms with domestic and foreign investors
Development of off-gridPVs in different parts of Khorasan-Razavi
 
100 MW – WIND FARM 
So far, we have done the initial and basic activities as following:
Feasibility Study
Getting Initial certificate from Ministry of Energy of Iran
land determination
Network Connection Study
Approval from local authorities such as environment, industry, natural resource and other organizations 
Exchanging EPCFMOU for the whole project with a Chinese Company (since we are supposed to use credit facilities between Iran and China)
Approval of Roads and Urban Development Infrastructure Committee of Khorasan-Razavi Province
Approval of the Supreme Council of Khorasan-Razavi government
Got the PPA from SUNA
 
1 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
2 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
3 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
4 . Procurement and Implementation of the Solar Power System. (1.5KW)
         (Khorasan)
5 . Procurement and Implementation of the Solar Power System.
         (Khorasan)
6 . Procurement and Implementation of the Solar Power System. (25KW)
         (Khorasan)
7 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
8 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
9 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
10 . Procurement and Implementation of the Solar Power System. (3KW)
         (Khorasan)
11 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
12 . Procurement and Implementation of the Solar Power System. (1KW)
         (Khorasan)
13 . Procurement and Implementation of the Solar Power System. (300W)
         (Khorasan)
14 . Procurement and Implementation of the Solar Power System. (500W)
        (Khorasan)
15 . Procurement and Implementation of the Solar Power System. (5KW)
        (Kashan)